Cause & Consequence
- Moving, flying or falling object
Incident Location
Drilling unit
Incident Activity
Modification of plant/structures
Incident Info Source
Marine Safety Forum
Specific Incident Equipment
Chemical Tank PRV
Lessons Identified
Initial and further investigation revealed that the valve must have been subject to unauthorised removal and replacement, during which it had been cross-threaded thereby weakening the connection sufficiently to allow it to loosen and fall.
The valve is only meant to be removed during periodic inspection by a qualified inspector.
The investigation also revealed that it was difficult if not impossible for the quayside gantry to have spotted the fault.
Incident Recommendations
The Supplier is adding an extra visual check to their procedure and is investigating ways to either isolate the valves or physically mark them as only to be removed by qualified inspectors.