Cause & Consequence
- Failure of vessels or pipework
Incident Location
Fixed Installation
Incident Activity
Production operations
Incident Info Source
Barry.Fraser@eon-ruhrgas.co.uk
Specific Incident Equipment
H4 Wellhead Connector
Lessons Identified
No formal procedures in place for pressure tesing verification of the hot stab
Procedures had insufficient chacks and balances
Incident Recommendations
Reduce HP riser pressure requirement to 1500 psi, to accomodate potential thermal expansion and agreed with riser supplier and connector manufacturer.
Ensure testing prtocol for verifying the flow of fluid feed from hot satb is in place.
Ensure ROV operator is able to monitor pressure within hot stab system at all times.