Search for Safety Alerts and Moments

What’s the difference? Safety Alerts give details of events surrounding an incident, near-miss or good practice. Safety Moments are downloadable PowerPoint presentations which give details of an incident, near-miss or good practice, discussion questions and related resources. Please note that every Safety Alert and Moment is deliberately kept anonymous to encourage sharing within the industry. No companies, installations, dates or names will be identified within the Alert or Moment.

Rate this Safety Alert
0
No votes yet
1038 1 pdf No details available. Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1037 1 pdf An unknown source is reportadly supplying hydrostatic release units which have been tested and have failed to meet the required SOLAS standards. Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1036 1 pdf The driller was instructed to operate the kelly spinner to overcome tight hole situations during the run in hole. Additionally the driller was instructed to work the drill string up and... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
During the picking up operations the partially unlatched joint of casing released the casing and it in turn fell out of the V door. Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1033 1 pdf The crew were picking up 13 3/8" casing with a single joint elevator and a long pick up assembly attached to the top drive. The casing caught on the A frame brace/roller. Both sling links... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1032 1 pdf Six workers were preparing a truck mounted crane for relocation. During this process and as one of the outriggers was being retracted, one of the workers reached across and extended... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1031 1 pdf Prior to the accident the pipelaying operation was stopped. The operators from the control units 1 and 2 (CU1 and CU2) reported a system failure and that the hydraulic power had been lost... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1030 1 pdf Operations at the time involved the breaking down of the slick line tool string on the rig floor. The kelly bushing had 4 kelly bushing holes of 3.5" diameter, and as the tool strick was... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
During the planning phase to repair pitting to Methanol Filter F301 door and closure face, an approved vendor was contacted to come and inspect the door mechanism for the purpose of stripping down... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1027 1 pdf The elevators were at the monkey board and the Derrickman had just latched the stand of pipe. The relief Driller shifted into gear and picked up the stand. The travelling block hit the... Read more
16 Jun 2011

Pages