Search for Safety Alerts and Moments

What’s the difference? Safety Alerts give details of events surrounding an incident, near-miss or good practice. Safety Moments are downloadable PowerPoint presentations which give details of an incident, near-miss or good practice, discussion questions and related resources. Please note that every Safety Alert and Moment is deliberately kept anonymous to encourage sharing within the industry. No companies, installations, dates or names will be identified within the Alert or Moment.

Rate this Safety Alert
0
No votes yet
1033 1 pdf The crew were picking up 13 3/8" casing with a single joint elevator and a long pick up assembly attached to the top drive. The casing caught on the A frame brace/roller. Both sling links... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1032 1 pdf Six workers were preparing a truck mounted crane for relocation. During this process and as one of the outriggers was being retracted, one of the workers reached across and extended... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1031 1 pdf Prior to the accident the pipelaying operation was stopped. The operators from the control units 1 and 2 (CU1 and CU2) reported a system failure and that the hydraulic power had been lost... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1030 1 pdf Operations at the time involved the breaking down of the slick line tool string on the rig floor. The kelly bushing had 4 kelly bushing holes of 3.5" diameter, and as the tool strick was... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
During the planning phase to repair pitting to Methanol Filter F301 door and closure face, an approved vendor was contacted to come and inspect the door mechanism for the purpose of stripping down... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1027 1 pdf The elevators were at the monkey board and the Derrickman had just latched the stand of pipe. The relief Driller shifted into gear and picked up the stand. The travelling block hit the... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1026 1 pdf During rig up operations a crane upper assembly failed. Whilst lifting the draw-works platform weighing 25 tonnes by means of two cranes, to instal the bracket support, one of the cranes... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
During the start-up of the platform after the planned shutdown, the Operations Team were equalizing the differential pressure across the import gas ESD valve with Nitrogen to enable import gas on to... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1024 1 pdf The Rig Manager reached for the joystick on the control panel, the back of his hand brushed against the rotary table speed control knob. Due to the lack of resistance on the rotary control... Read more
16 Jun 2011
Rate this Safety Alert
0
No votes yet
1023 1 pdf Lifting and moving procedures as a complex lift incorrectly assessed Read more
15 Jun 2011

Pages