Cause & Consequence
- Uncontrolled release of a flammable gas or liquid
Incident Location
Fixed Installation
Incident Activity
Production operations
Specific Incident Equipment
Flare condensate pump
Lessons Identified
The set point of the pressure monitoring switch was set such that in the event of a seal failure there would not be sufficient pressure rise to for the switch to operate and the pump to trip
There was no requirement to check the operation of the pressure monitoring switch in the planned maintenance system
Whilst the platform was under previous ownership, the sump below the flare gas scrubber had been sealed up to prevent a condensate release draining to sea however this now allows a build-up of the condensate in the sump in the event of a leak
Incident Recommendations
Ensure that the set points of any pressure monitoring switches are set accordingly so that the pump will be tripped in the event of a seal failure
Ensure that operation of the pressure monitoring switches are checked as part of a suitable planned maintenance system
Be aware of any historical changes that may have occurred prior to platform ownership and ensure that suitable robust management of change procedures have been applied